Study the delays and conflicts for construction projects and their mutual relationship: A review

Are you an author of this work?Link to your sovereign AfriScholar profile
Published in: Ain Shams Engineering Journal (ASEJ)
Publisher: Elsevier BV • Egypt • 2090-4479
DOI: https://doi.org/10.1016/j.asej.2022.101815

Abstract

Delays and conflicts (D&Cs) are adversely affecting the performance of construction projects. They have separately been addressed by many authors but the mutual relationship among them is still a key grey area. Therefore, this study aims to explore this hidden relationship. Literature was reviewed to identify the previous ranking of D&Cs causes to develop a global ranking and to explore other hidden aspects of mutual relationships. Data were classified through Jenks optimization that resulted in the identification of, the top five causes of D&Cs in a global perspective and commonality among them. Among the top five identified global causes of D&Cs, the common causes are; (1) financial problems on behalf of the owner, (2) Change orders/ Variations, and (3) Lack of communication/ Poor relationship. Such exploration of hidden relationships among D&Cs will not only improve construction management strategies but will also define new pathways for future research to secure project success parameters.

Download Full Text PDFView at PublisherCrossref RecordCrossref XML

Verified Citation Velocity

Recorded scholarly citations in African and international peer-reviewed literature

142
Total Citations

Citations are continuously tracked and harvested across continental OJS endpoints and OpenAlex feeds.